Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FB0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FB0018","OO2 - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION AND DRAINAGE STRUCTURE ALONG QUIRANGAY RIVER, CAMALIG, ALBAY (PACKAGE 2)","Flood Control and Drainage","On-Going",96498478.32,0,86.51,"Albay 2nd DEO","Region V","NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION (40088)","2024-02-26",null,2024,"Regular Infra - GAA 2024 OO-2",13.18471,123.6517,"500502000","500500000"]
SHA-256
b68283839dfefb1bb0d620a8f333af83cdd347e4f78a627b07b1355b28b7617b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.