Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FB0081

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FB0081","OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF REVETMENT WALL AND CHANNEL EXCAVATION ALONG BARANGAY BARIW, CAMALIG, ALBAY","Flood Control and Drainage","On-Going",46560154.73,0,89.92,"Albay 2nd DEO","Region V","ANTONIO V. NIDEA CONST., INC.(FORMERLY ANTONIO V. (6382)","2024-04-12",null,2024,"Regular Infra - GAA 2024 OO-2",13.16267,123.62656,"500502000","500500000"]
SHA-256
8ead118af2270ad2ee2fefc18d25e1cb68c5cabc2b2977f0e7af4d41aee817b9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.