Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FB0083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FB0083","BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DIKE), YAWA RIVER, BARANGAY CULLAT, BINITAYAN, DARAGA, ALBAY","Flood Control and Drainage","On-Going",57540918.42,0,17.21,"Albay 2nd DEO","Region V","ALRO CONSTRUCTION & DEVELOPMENT CORP. (18361)","2024-04-12",null,2024,"Regular Infra - GAA 2024 SSP",13.15919,123.71713,"500503000","500500000"]
SHA-256
b2a1c01e793d4c7dd328dd746fd0fece2e3a587d00ca3267851fdd58ce15f7e7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.