Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FB0214

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FB0214","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SHORE PROTECTION AT BOGTONG, RAPU-RAPU, ALBAY","GAA 2024 OO-2","On-Going",125774825.95,0,89.91,"Albay 2nd DEO","Region V","PROTOSTAR CONSTRUCTION (47130) / SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2024-09-25",null,2024,"Regular Infra - GAA 2024 OO-2",13.21692,124.02225,"500515000","500500000"]
SHA-256
f1008b19a420d1d4e07cb8a599d139cd97ca642f73cdefadb94eb29f44534d37

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.