Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FJ0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FJ0024","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAN RAMON RIVER, USON, MASBATE","GAA 2024 OO-2","Completed",96435398.19,0,100,"Masbate 3rd DEO","Region V","A3 CONSTRUCTION & SUPPLY (39671) / CL CARANDANG CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: CL CARANDANG ENTERPRISES) (29494)","2024-02-15","2024-11-15",2024,"Regular Infra - GAA 2024 OO-2",12.13903,123.71331,"504121000","504100000"]
SHA-256
0819c52777ca903675b966cde1b86bc664628c3ad2fcec034e5a47a274a9ee5b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.