Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24GP0031

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24GP0031","CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAYA, DUMALAG, CAPIZ","GAA 2024 OO-2","On-Going",78527280.87,0,57.38,"Capiz 2nd DEO","Region VI","GAP CONSTRUCTION AND DEVELOPMENT CO. (39888) / HENSCHA PHILS. INC. (34164)","2024-02-26",null,2024,"Regular Infra - GAA 2024 OO-2",11.30151,122.61973,"601903000","601900000"]
SHA-256
fca8ed50485f5f5cd5d0510287685d68b7038fb76d46e5129ac9623d9c10b390

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.