Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HC0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HC0041","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS","GAA 2024 OO-2","Completed",96396999.89,0,100,"Bohol 2nd DEO","Region VII","LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION) (13524)","2024-03-21","2025-08-31",2024,"Regular Infra - GAA 2024 OO-2",10.0853,124.11746,"701209000","701200000"]
SHA-256
1e093d119db866858f79755d48f452682630f98407b8121f6aab1e42ae22a3fc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.