Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HD0103

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HD0103","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM ALONG MALINGIN RIVER, BOGO CITY, CEBU","Flood Control and Drainage","Completed",19600000,0,100,"Cebu 4th DEO","Region VII","ADAMANT DEVELOPMENT CORPORATION (54359)","2024-07-10","2024-12-21",2024,"Regular Infra - GAA 2024 OO-2",11.01635,123.98801,"702211000","702200000"]
SHA-256
0acd7565e17f3a577b80d0f2d8b466f36f9a3e348c0607095daa60f8708e9c2e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.