Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HO0165

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HO0165","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) AT SITIO","Unprogrammed Appropriations 2024","On-Going",142572978.31,0,100,"Cebu 7th DEO","Region VII","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2024-12-19",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",9.68038,123.35359,"702229000","702200000"]
SHA-256
f2d2adcd2f0bce49e8432009180f46c0f4df356818c1c8fa711559f1ef5bed32

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.