Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24IA0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24IA0020","CONSTRUCTION OF LOMBOY FLOOD CONTROL STRUCTURE, BARANGAY CALUMPANG, NAVAL, BILIRAN","GAA 2024 OO-2","Completed",77136479.67,0,100,"Biliran DEO","Region VIII","LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)","2024-02-11","2024-07-10",2024,"Regular Infra - GAA 2024 OO-2",11.584,124.42223,"807808000","807800000"]
SHA-256
61821900bfc4aeab00ceb89427307e9e150c0d133f287420af4e37d5d137deb1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.