Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24IG0075

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24IG0075","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAGBANGANAN RIVER, BARANGAY MAKINHAS, BAYBAY, LEYTE","Flood Control and Drainage","Completed",116396555.12,0,100,"Leyte 5th DEO","Region VIII","C N E CONSTRUCTION (22148) / RJIR ENTERPRISES CORPORATION (34843)","2024-04-23","2025-03-16",2024,"Regular Infra - GAA 2024 OO-2",10.63471,124.86934,"803708000","803700000"]
SHA-256
e274c9a57c1cd4892e6160ac46027cb4b389d90da21e20f15aeb7c4cb9306c95

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.