Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24J00158

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24J00158","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBUCO RIVER, SIBUCO BR. SECTION PACKAGE 2, SIBUCO, ZAMBOANGA DEL NORTE","Flood Control and Drainage","On-Going",152855998.54,0,89.86,"Region IX","Region IX","MINDANAO ROCK (23479)","2024-07-22",null,2024,"Regular Infra - GAA 2024 OO-2",7.2964,122.07083,"907216000","907200000"]
SHA-256
c688b2e8820bf107a30c01e8af6b0d016c2cf2009742ef3ea1222f15add3458f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.