Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24K00133

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24K00133","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGAYARAN RIVER (UPSTREAM) OF NABALIWA BRIDGE PACKAGE 2, PANGANTUCAN, BUKIDNON","Flood Control and Drainage","Completed",70821287.43,0,100,"Region X","Region X","C'ZARLES CONSTRUCTION & SUPPLY (23426)","2024-05-03","2025-01-30",2024,"Regular Infra - GAA 2024 OO-2",7.87347,124.74661,"1001316000","1001300000"]
SHA-256
9f96e73ee391f157090630797ca4c3dd7a71ce95d9a67f5296e7153d4102a656

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.