Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24KF0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24KF0026","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION AT ILIAN BRIDGE ALONG BAUYAN RIVERSTREAM, UPSTREAM (L/S), STA 0+000 - STA. 0+250, SND, LANAO DEL NORTE","GAA 2024 OO-2","Completed",48840967.7,0,100,"Lanao del Norte 2nd DEO","Region X","AL HUSSEIN CONSTRUCTION (18438) / MOYA CONSTRUCTION (47707)","2024-02-16","2024-11-18",2024,"Regular Infra - GAA 2024 OO-2",7.74217,123.81448,"1003506000","1003500000"]
SHA-256
b5ff46ea5b359f4facb70cabe788456dd2fe0c42c1f7140bb698027908e6c4f1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.