Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24KL0002

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24KL0002","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SOLANA RIVER (UPSTREAM & DOWNSTREAM OF SOLANA BY-PASS BRIDGE) PACKAGE 1, JASAAN, MISAMIS ORIENTAL","Flood Control and Drainage","Completed",96500000,0,100,"Misamis Oriental 2nd DEO","Region X","MIKKIL CONSTRUCTION (37020) / VICTORIANO C. LIM CONSTRUCTION CORPORATION (FORMERLY: VICTORIANO C. LIM CONSTRUCTION) (25318)","2024-02-05","2024-11-25",2024,"Regular Infra - GAA 2024 OO-2",8.62967,124.76504,"1004311000","1004300000"]
SHA-256
15a0399d343de2c8dd576346b5fbf243d4fa3e98359103f511ba8592c906ca01

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.