Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24KL0098

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24KL0098","CONSTRUCTION OF ROAD, MANTICAO - OPOL ROAD, MISAMIS ORIENTAL (PACKAGE 3)","GAA 2024 SSP","Completed",99000000,0,100,"Misamis Oriental 2nd DEO","Region X","MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION (15885) / OLISON CORPORATION (45571)","2024-02-29","2024-11-20",2024,"Regular Infra - GAA 2024 SSP",8.33919,124.3987,"1004318000","1004300000"]
SHA-256
5d69000282dd242d7bc6855ac4c690c77f681ae392632782b33dd9d60af354fd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.