Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24LI0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24LI0040","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I","Flood Control and Drainage","Completed",144749965.8,0,100,"Davao de Oro 2nd DEO","Region XI","AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC. (22998)","2024-03-27","2025-03-18",2024,"Regular Infra - GAA 2024 OO-2",7.82997,126.05008,"1108207000","1108200000"]
SHA-256
f5357d86cab404269344ecd5dba3777c7b44d8ac08b670310db0b8fb7079c748

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.