Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24LI0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24LI0041","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE II","GAA 2024 OO-2","Completed",144749687,0,100,"Davao de Oro 2nd DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2024-04-24","2025-06-16",2024,"Regular Infra - GAA 2024 OO-2",7.82713,126.04545,"1108207000","1108200000"]
SHA-256
7abd21a8bc886f6d038d1861fbe8742fb0794ae6457e3aa19fa3a413b1f28b11

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.