Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24MI0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24MI0029","CONSTRUCTION OF MLANG RIVER FLOOD CONTROL PROJECT (UPSTREAM OF MLANG BRIDGE, LEFT SIDE), BARANGAY POBLACION A, MLANG, COTABATO","Flood Control and Drainage","Completed",86849999.38,0,100,"Cotabato 3rd DEO","Region XII","JARGON CONSTRUCTION & SUPPLY (23474)","2024-02-19","2024-12-05",2024,"Regular Infra - GAA 2024 OO-2",6.94505,124.88904,"1204710000","1204700000"]
SHA-256
13b7e7c8fdb731f77b1382f303831eb255cee7c9992d39b21932182d12ae9619

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.