Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24NF0116

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24NF0116","CONSTRUCTION OF NRJ SOCORRO-NUEVA ESTRELLA-SUDLON-SOHOTON COVE SLOPE PROTECTION STRUCTURE, PACKAGE 1, SOCORRO, SURIGAO DEL NORTE","GAA 2024 SSP","Completed",67529146.49,0,100,"Surigao del Norte 1st DEO","Region XIII","BOOMETRIX DEVELOPMENT CORP. (40441)","2025-01-07","2026-01-31",2024,"Regular Infra - GAA 2024 SSP",9.60947,125.93483,"1606723000","1606700000"]
SHA-256
c43a63a265d847aa0b55c834ae42287e111e18657fa0169bb16de6b2259a696a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.