Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24NH0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24NH0046","CONSTRUCTION OF DIKE REVETMENT ALONG HUBO RIVER BASIN PROTECTING HUBO BRIDGE, DOWNSTREAM, BARANGAY BUHISAN, SAN AGUSTIN, SURIGAO DEL SUR","Flood Control and Drainage","Completed",96499475.88,0,100,"Surigao del Sur 1st DEO","Region XIII","J.M. LUCIANO CONSTRUCTION,  INC. (2083)","2024-04-03","2025-06-12",2024,"Regular Infra - GAA 2024 OO-2",8.75236,126.20939,"1606815000","1606800000"]
SHA-256
b81ebbf4637868b949d22b7422032f148455dea28aabd8a9d83c3185a219782f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.