Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24PA0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24PA0025","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF POBLACION-DEET FLOOD CONTROL ALONG ABRA RIVER, TAYUM,  ABRA","Flood Control and Drainage","Completed",144710474.23,0,100,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234) / TWINFORMERS CONSTRUCTION SERVICES (51130)","2024-02-13","2024-08-16",2024,"Regular Infra - GAA 2024 OO-2",17.6221,120.66229,"1400124000","1400100000"]
SHA-256
6308c15dcee8f352a7aaaa2949fd6587aaac3d233af8551395bba5cbd2dd9d05

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.