Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24PA0202

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24PA0202","CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRA","Unprogrammed Appropriations 2024","On-Going",137950248.93,0,100,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234)","2025-01-14",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",17.5789,120.60653,"1400101000","1400100000"]
SHA-256
6a345b9d32e6ba93ca4ba6e8a05c530739a11523fd7ad257d5aba3abfbdd4774

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.