Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24PL0111

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24PL0111","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CUDAL RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG MAGABANGON BRIDGE, STA. 1+86","GAA 2024 OO-2","On-Going",95051253.9,0,90.01,"Lower Kalinga DEO","Cordillera Administrative Region","BHM CONSTRUCTION (30724)","2024-11-08",null,2024,"Regular Infra - GAA 2024 OO-2",17.32638,121.44138,"1403213000","1403200000"]
SHA-256
afb1d3432d924407c7ee9bf256e71e13e8123bb147874c7496591b41f3c5573c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.