Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25A00042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25A00042","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP GRANDE, DAGUPAN CITY, PANGASINAN","Flood Control and Drainage","On-Going",146593710.77,0,61.41,"Region I","Region I","BET CONSTRUCTION & SUPPLY (31764)","2025-02-24",null,2025,"Regular Infra - GAA 2025 OO-2",16.02439,120.34556,"105518000","105500000"]
SHA-256
564a044fa06932ab94c1dfe2bb611fa5ac3a749603d5d23bd23fe694e261ca4b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.