Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25A00132

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25A00132","BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HALOG EAST, TUBAO, LA UNION","Flood Control and Drainage","Completed",33617484.27,0,100,"Region I","Region I","VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540)","2025-02-24","2025-04-22",2025,"Regular Infra - GAA 2025 SSP",16.35138,120.41735,"103320000","103300000"]
SHA-256
9305a905eea5af6e683bd8ae51012d4de395323e8a258ff9ca94cb1ca0dc5e1d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.