Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AA0039

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0039","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, BARANGAY DADAOR, BANGUI, ILOCOS NORTE","Flood Control and Drainage","On-Going",47030654.37,0,92.03,"Ilocos Norte 1st DEO","Region I","BJMJB CONSTRUCTION & SUPPLY (44546)","2025-02-17",null,2025,"Regular Infra - GAA 2025 OO-2",18.4983,120.71609,"102804000","102800000"]
SHA-256
02566f365cd607ab5196cca34a4b748523a86bfcdc98cb5465baa901b2e8e290

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.