Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AA0105

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0105","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN CRISTOBAL, SARRAT, ILOCOS NORTE","Flood Control and Drainage","On-Going",4749366.05,0,0,"Ilocos Norte 1st DEO","Region I","BJMJB CONSTRUCTION & SUPPLY (44546)","2025-04-02",null,2025,"Regular Infra - GAA 2025 OO-2",18.15447,120.66556,"102821000","102800000"]
SHA-256
6fe6bffa632a8157b9eceead3541f10a7d5a2c0f978c61f40b59c9b4fdd72ad5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.