Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AA0135

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0135","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY TULNAGAN, PASUQUIN, ILOCOS NORTE","Flood Control and Drainage","On-Going",47501671.97,0,84.5,"Ilocos Norte 1st DEO","Region I","HAUSLAND CONSTRUCTION (32378)","2025-03-28",null,2025,"Regular Infra - GAA 2025 OO-2",18.4059,120.59573,"102817000","102800000"]
SHA-256
d893bbde31943bdb9633376725b8724a5bd47c302c52ddfb80197d0d8422a10f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.