Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AA0476

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0476","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF SEAWALL, POBLACION 2, PAGUDPUD, ILOCOS NORTE","Flood Control and Drainage","On-Going",47025441.33,0,73.8,"Ilocos Norte 1st DEO","Region I","11-16 CONSTRUCTION (29646)","2025-02-13",null,2025,"Regular Infra - GAA 2025 SSP",18.56886,120.78754,"102815000","102800000"]
SHA-256
b1e6a1e285dbafae3f00fa64ac421770f13102a9437f6fb0d6cd9fc5c8eac74b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.