Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AA0477

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0477","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, POBLACION 1, PAGUDPUD, ILOCOS NORTE","Flood Control and Drainage","On-Going",47068139.46,0,96.92,"Ilocos Norte 1st DEO","Region I","11-16 CONSTRUCTION (29646)","2025-02-13",null,2025,"Regular Infra - GAA 2025 SSP",18.57046,120.57046,null,"102800000"]
SHA-256
a1f5b2c2415bec60215c76dcc1a6611da33c8c5f0192259002b8ec7ccdc770f7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.