Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AA0524

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0524","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF DRAINAGE CANAL STRUCTURE ALONG QUEZON BOULEVARD, BARANGAY 9 SAN AGUSTIN II, BACARRA, ILOCOS NORTE","Flood Control and Drainage","On-Going",4665629.61,0,100,"Ilocos Norte 1st DEO","Region I","BJMJB CONSTRUCTION & SUPPLY (44546)","2025-02-13",null,2025,"Regular Infra - GAA 2025 SSP",18.2551,120.60516,"102802000","102800000"]
SHA-256
1037357678971649bef8103d813560a47fec2f0b9f50e8a982732a53e2027840

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.