Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BE0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BE0050","CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF SAN LORENZO BRIDGE (PHASE I)","GAA 2025 SSP","On-Going",47964551.66,0,100,"Isabela 1st DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2025-05-21",null,2025,"Regular Infra - GAA 2025 SSP",17.21648,121.90586,"203114000","203100000"]
SHA-256
d461e702c6bc4adf4af4efd07ee2437bb500c449a5cb9c7467b56f5347bc56b5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.