Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BF0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BF0005","OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN JOSE NORTE SECTION)BARANGAY SAN JOSE NORTE, MALLIG, ISABELA","Flood Control and Drainage","Completed",96497268.01,0,100,"Isabela 2nd DEO","Region II","JWU CONSTRUCTION AND SUPPLY (48659)","2025-04-14","2025-08-11",2025,"Regular Infra - GAA 2025 OO-2",17.21172,121.56385,"203119000","203100000"]
SHA-256
0e45803435f337ac602a00f76334ed56291ea9ba98afd3a9b7895a78728a3d87

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.