Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BG0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BG0003","OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF PINACANAUAN RIVER FLOOD   CONTROL PROJECT (PHASE 2), BARANGAY MALUNO SUR, BENITO","GAA 2025 OO-2","On-Going",96489988.08,0,100,"Isabela 3rd DEO","Region II","MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT (46551)","2025-03-18",null,2025,"Regular Infra - GAA 2025 OO-2",16.99236,121.96121,"203104000","203100000"]
SHA-256
4bb9bbcd45e8a6802b0dfead596e15b66dd6e23790db16d64077195a0a2d0ff4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.