Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BG0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BG0014","OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN  RIVER FLOOD CONTROL STRUCTURE, BRGY. DIPUSU","GAA 2025 OO-2","Completed",48947367.58,0,100,"Isabela 3rd DEO","Region II","CAMBERWELL CONSTRUCTION AND SUPPLIES (39624)","2025-03-05","2025-07-07",2025,"Regular Infra - GAA 2025 OO-2",16.92877,122.02047,"203131000","203100000"]
SHA-256
1c2a4c2e54f2518117a85b8382dc78d02dadf1cc4053c7257b822e0d7b396c58

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.