Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BJ0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BJ0030","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEGUEM FLOOD CONTROL STRUCTURE, SECTION 2, BARANGAY SEGUEM, KASIBU, NUEVA V","Flood Control and Drainage","On-Going",55595579.95,0,76.9,"Nueva Vizcaya 2nd DEO","Region II","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)","2025-02-14",null,2025,"Regular Infra - GAA 2025 OO-2",16.27749,121.31724,"205009000","205000000"]
SHA-256
3bd66aea1b9fac9743a431dc00edb0e8b2c33f1b77e16149c5f4f36443535f33

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.