Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CC0313

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CC0313","CONSTRUCTION OF REINFORCED CONCRETE RIVER PROTECTION STRUCTURES ALONG BALAGTAS RIVER (TRIBUTARY) BARANGAY SAN JOSE PUROK 1, PLARIDEL, BULACAN (PACKAGE C)","Flood Control and Drainage","Not Yet Started",71285954.12,0,0,"Bulacan 1st DEO","Region III","TOPNOTCH CATALYST BUILDERS INC. (34061)",null,null,2025,"Regular Infra - GAA 2025 SSP",14.89916,120.90298,"301406000","301400000"]
SHA-256
35a54192ca972c18e517b8d086c71a120d6efb5c2a8dcc7f6eac7614693ca4ce

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.