Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CC0447

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CC0447","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AT CALERO CREEK, MALOLOS CITY, BULACAN (PHASE III)","GAA 2025 SSP","Not Yet Started",47491338.11,0,0,"Bulacan 1st DEO","Region III","C.T. LEONCIO CONSTRUCTION & TRADING (17371) / M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)",null,null,2025,"Regular Infra - GAA 2025 SSP",14.83031,120.81106,"301410000","301400000"]
SHA-256
8970a5701f1d6a2432b5b79212777024059f0467a1de9508d347aee1a9f28911

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.