Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CE0194

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CE0194","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA","GAA 2025 SSP","Completed",96499275.17,0,100,"Nueva Ecija 1st DEO","Region III","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / BRYAN PAUL P. PACHECO CONST. CORP. (56016)","2025-05-22","2025-12-15",2025,"Regular Infra - GAA 2025 SSP",15.71572,120.87147,"304917000","304900000"]
SHA-256
25f973c47ccb156eb596a1dd99dcf47f2faf33dc98b7babe84342b35d2f5122b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.