Project 25CI0015
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CI0015","CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL WORKS ALONG QUITANGIL RIVER, MAGALANG, PAMPANGA","Flood Control and Drainage","Completed",96488991.49,0,100,"Pampanga 3rd DEO","Region III","TONKA CONSTRUCTION (4064)","2025-02-20","2025-07-04",2025,"Regular Infra - GAA 2025 SSP",15.25564,120.74076,"305411000","305400000"]
SHA-256
7ca354f4d11e7bdeadaaf3a57bd3e5199a6f288500c7a6b02d46a5d475061379Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.