Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0057","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC","GAA 2025 SSP","Completed",99000000,0,100,"Tarlac DEO","Region III","L.R. TIQUI BUILDERS, INC. (13810)","2025-02-17","2025-11-21",2025,"Regular Infra - GAA 2025 SSP",15.68433,120.62777,"306912000","306900000"]
SHA-256
d4f343bff7cd25823d061615ebd8d97319c8489b222c5036677c692a7697e900

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.