Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0100

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0100","CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN ISIDRO CREEK (PHASE 4), TARLAC CITY, TARLAC","Flood Control and Drainage","Completed",74250000,0,100,"Tarlac DEO","Region III","CHIARA2300 INCORPORATED (8736) / HIGH STRENGTH DEV. CORPORATION (31976)","2025-03-18","2025-06-18",2025,"Regular Infra - GAA 2025 OO-2",15.51389,120.59556,"306916000","306900000"]
SHA-256
581ea30148777c5859a83f6643dc87bee839912bf3c9c4436319399dc9f4223d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.