Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CK0036

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CK0036","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE III), LA PAZ, TARLAC","Flood Control and Drainage","On-Going",38206047.56,0,95.29,"Tarlac 2nd DEO","Region III","RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS (43511)","2025-03-25",null,2025,"Regular Infra - GAA 2025 SSP",15.4054,120.7541,"306907000","306900000"]
SHA-256
552b199953bc35209818fa2f29f4b1612e58e305beaad85be5f4eedc178c94f4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.