Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CL0151

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CL0151","CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES","GAA 2025 SSP","On-Going",98968119.46,0,97.8,"Zambales 1st DEO","Region III","JTC CRUZ CONSTRUCTION CO., INC. (32479)","2025-04-03",null,2025,"Regular Infra - GAA 2025 SSP",15.0272,120.119,"307112000","307100000"]
SHA-256
8139e9081dd604ecd850b05fe0c6144ef7c18bc191d2627bb0a031af18e13033

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.