Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CP0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CP0032","FLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL (DOWNSTREAM),PUROK 1 SECTION,BRGY. BUBULONG MUNTI,SAN ILDEFON","GAA 2025 OO-2","On-Going",96499206.34,0,85.14,"Bulacan 3rd DEO","Region III","ADSL CONSTRUCTION & TRADING (48245)","2025-03-14",null,2025,"Regular Infra - GAA 2025 OO-2",15.09159,121.01366,"301419000","301400000"]
SHA-256
65b7ebd6bf3ead799ad65aff0031e48c96e7c8059032c633193339adcc1ba533

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.