Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CP0137

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CP0137","CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA.PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURES ALONG MAASIM RIVER,BRGY. UPIG, SAN ILDEFONSO, BULACAN (UPSTREAM)","Flood Control and Drainage","On-Going",97563968.22,0,42.82,"Bulacan 3rd DEO","Region III","SELPHAR CONSTRUCTION (39875)","2025-06-01",null,2025,"Regular Infra - GAA 2025 SSP",15.161,121.046,"301421000","301400000"]
SHA-256
070e5c1a0ae9457a09508f8f18d9fe9c37222b0bae05681607ea7c5160feafaf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.