Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DE0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DE0008","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS","GAA 2025 SSP","Completed",4801505,0,100,"Batangas 2nd DEO","Region IV-A","GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION) (31101)","2025-02-18","2025-05-03",2025,"Regular Infra - GAA 2025 SSP",13.84087,120.9164,"401024000","401000000"]
SHA-256
2db2b852d97202a4bc5a95cfb65c42950994c56175ddb49622eba147d1bf1aef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.