Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DI0058

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DI0058","CONSTRUCTION OF RIVER PROTECTION STRUCTURE (NEAR CALAMBA HILLS PHASE 2 BRIDGE UPSTREAM), PHASE 1, CALAMBA CITY, LAGUNA","Flood Control and Drainage","On-Going",48115669.59,0,90.29,"Laguna 2nd DEO","Region IV-A","DATZLAV CONSTRUCTION (44326)","2025-03-13",null,2025,"Regular Infra - GAA 2025 OO-2",14.20484,121.12399,"403405000","403400000"]
SHA-256
8d0ce54ac63cfa9fcff5f1e8766dba0f4c4b6a25ac3dcd949b31b0805362176d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.