Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DN0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DN0014","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO UPPER KILINGAN, PHASE 4, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)","GAA 2025 OO-2","On-Going",47039718.5,0,100,"Rizal 1st DEO","Region IV-A","LTDL BUILDERS (38371)","2025-02-17",null,2025,"Regular Infra - GAA 2025 OO-2",14.60024,121.27981,"405802000","405800000"]
SHA-256
7ece183dfbe6199714ef0863f0c01f59352dc0b8fd58bbed8f6e081bb3759123

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.